UK renewable project intelligence · REPD 11755
Concorde Way, Segensworth - Solar Panels
Solar Advanced Systems T/A SAS Energy · Solar Photovoltaics · South East
Planning record
Project Evidence
Source fields are retained from the latest UK Renewable Energy Planning Database snapshot.
TechnologySolar Photovoltaics
Operator or applicantSolar Advanced Systems T/A SAS Energy
RegionSouth East
CountyHampshire
CountryEngland
Planning authorityWinchester
Planning reference22/01583/PNSOL
CfD allocation roundNot reported
Planning history
Planning Timeline
- Planning submitted
- Planning granted
- Construction started
- Latest public record
Time to operation
Delivery Signal
Relative two-year evidence for prioritisation, separated from unvalidated literal probabilities and external-risk scenarios.
Two-year signal77/100Stronger relative evidence
Three-year outputResearch onlyNot released as a probability
Five-year outputWithheldInsufficient validated cohorts
The score is a percentile rank, not a 77% chance of delivery. Use it to prioritise comparable projects, then inspect the dated planning evidence and constraints before making a decision.
Positive public evidence
- Construction has started
Risks and missing evidence
- Long time in current stage