UK renewable project intelligence · REPD 11756
Paytherden Solar Farm (Peradon)
Lightrock Power Limited · Solar Photovoltaics · South West
Planning record
Project Evidence
Source fields are retained from the latest UK Renewable Energy Planning Database snapshot.
TechnologySolar Photovoltaics
Operator or applicantLightrock Power Limited
RegionSouth West
CountyDevon
CountryEngland
Planning authorityEast Devon
Planning reference21/3120/MFUL
CfD allocation roundAR5
Planning history
Planning Timeline
- Planning submitted
- Planning granted
- Construction started
- Latest public record
Time to operation
Delivery Signal
Relative two-year evidence for prioritisation, separated from unvalidated literal probabilities and external-risk scenarios.
Two-year signal78/100Stronger relative evidence
Three-year outputResearch onlyNot released as a probability
Five-year outputWithheldInsufficient validated cohorts
The score is a percentile rank, not a 78% chance of delivery. Use it to prioritise comparable projects, then inspect the dated planning evidence and constraints before making a decision.
Positive public evidence
- Construction has started
- CfD support recorded
Risks and missing evidence
- Long time in current stage