UK renewable project intelligence · REPD 13758
Girvan Distillery, Main Street - Anaerobic Digestion Facility
Grissan Carrick Limited · Anaerobic Digestion · Scotland
Planning record
Project Evidence
Source fields are retained from the latest UK Renewable Energy Planning Database snapshot.
TechnologyAnaerobic Digestion
Operator or applicantGrissan Carrick Limited
RegionScotland
CountyStrathclyde
CountryScotland
Planning authoritySouth Ayrshire
Planning reference23/00271/APP
CfD allocation roundNot reported
Planning history
Planning Timeline
- Planning submitted
- Planning granted
- Latest public record
Time to operation
Delivery Signal
Relative two-year evidence for prioritisation, separated from unvalidated literal probabilities and external-risk scenarios.
Two-year signal6/100Lower relative evidence
Three-year outputResearch onlyNot released as a probability
Five-year outputWithheldInsufficient validated cohorts
The score is a percentile rank, not a 6% chance of delivery. Use it to prioritise comparable projects, then inspect the dated planning evidence and constraints before making a decision.
Positive public evidence
- Construction has started
Risks and missing evidence
- Long time in current stage