Blaenpant, Blaenwaun - Wind turbine

Private Developer · Wind Onshore · Wales

Reported capacity0.2 MWInstalled Capacity (MWelec) in the public REPD record
Development stageApplication SubmittedCurrent short status in the latest source snapshot
Screening score45/100Medium heuristic screening risk

Planning record

Project Evidence

Source fields are retained from the latest UK Renewable Energy Planning Database snapshot.

TechnologyWind Onshore
Operator or applicantPrivate Developer
RegionWales
CountyDyfed
CountryWales
Planning authorityCarmarthenshire
Planning referencePL/06513
CfD allocation roundNot reported

Planning history

Planning Timeline

  • Planning submitted
  • Latest public record

Time to operation

Delivery Signal

Relative two-year evidence for prioritisation, separated from unvalidated literal probabilities and external-risk scenarios.

Two-year signal2/100Lower relative evidence
Three-year outputResearch onlyNot released as a probability
Five-year outputWithheldInsufficient validated cohorts
Ranking signal only · Moderate public-data coverage

The score is a percentile rank, not a 2% chance of delivery. Use it to prioritise comparable projects, then inspect the dated planning evidence and constraints before making a decision.

Positive public evidence

  • No strong positive signal in public data

Risks and missing evidence

  • Early development stage
  • Long time in current stage