UK renewable project intelligence · REPD 16345
Fletchwood Lane, Totton - Solar Park
Trant Engineering Limited · Solar Photovoltaics · South East
Planning record
Project Evidence
Source fields are retained from the latest UK Renewable Energy Planning Database snapshot.
TechnologySolar Photovoltaics
Operator or applicantTrant Engineering Limited
RegionSouth East
CountyHampshire
CountryEngland
Planning authorityNew Forest
Planning reference25/00760FULL
CfD allocation roundNot reported
Planning history
Planning Timeline
- Planning submitted
- Latest public record
Time to operation
Delivery Signal
Relative two-year evidence for prioritisation, separated from unvalidated literal probabilities and external-risk scenarios.
Two-year signal20/100Lower relative evidence
Three-year outputResearch onlyNot released as a probability
Five-year outputWithheldInsufficient validated cohorts
The score is a percentile rank, not a 20% chance of delivery. Use it to prioritise comparable projects, then inspect the dated planning evidence and constraints before making a decision.
Positive public evidence
- No strong positive signal in public data
Risks and missing evidence
- Early development stage