UK renewable project intelligence · REPD 04923

North London Heat and Power (Edmonton EcoPark Replacement)

North London Waste Authority (NLWA) · EfW Incineration · London

Reported capacity70 MWInstalled Capacity (MWelec) in the public REPD record
Development stageAwaiting ConstructionCurrent short status in the latest source snapshot
Screening score62/100Low heuristic screening risk

Planning record

Project Evidence

Source fields are retained from the latest UK Renewable Energy Planning Database snapshot.

TechnologyEfW Incineration
Operator or applicantNorth London Waste Authority (NLWA)
RegionLondon
CountyLondon
CountryEngland
Planning authorityThe Planning Inspectorate - National Infrastructure
Planning referenceEN010071
CfD allocation roundNot reported

Planning history

Planning Timeline

  • Planning submitted
  • Planning granted
  • Latest public record

Time to operation

Delivery Signal

Relative two-year evidence for prioritisation, separated from unvalidated literal probabilities and external-risk scenarios.

Two-year signal7/100Lower relative evidence
Three-year outputResearch onlyNot released as a probability
Five-year outputWithheldInsufficient validated cohorts
Ranking signal only · Moderate public-data coverage

The score is a percentile rank, not a 7% chance of delivery. Use it to prioritise comparable projects, then inspect the dated planning evidence and constraints before making a decision.

Positive public evidence

  • Construction has started

Risks and missing evidence

  • Long time in current stage
Source and scope. Project facts derive from the official DESNZ Renewable Energy Planning Database quarterly extract. Delivery signals and screening scores are research enrichments by this platform; public data does not reveal private finance, land, supply-chain or contract terms.