UK renewable project intelligence · REPD 08456

M-Sport Limited

M-Sport Limited · Solar Photovoltaics · North West

Reported capacity0.3 MWInstalled Capacity (MWelec) in the public REPD record
Development stageAwaiting ConstructionCurrent short status in the latest source snapshot
Screening score60/100Low heuristic screening risk

Planning record

Project Evidence

Source fields are retained from the latest UK Renewable Energy Planning Database snapshot.

TechnologySolar Photovoltaics
Operator or applicantM-Sport Limited
RegionNorth West
CountyCumbria
CountryEngland
Planning authorityCumberland
Planning referenceFUL/2021/0050
CfD allocation roundNot reported

Planning history

Planning Timeline

  • Planning submitted
  • Planning granted
  • Latest public record

Time to operation

Delivery Signal

Relative two-year evidence for prioritisation, separated from unvalidated literal probabilities and external-risk scenarios.

Two-year signal62/100Typical relative evidence
Three-year outputResearch onlyNot released as a probability
Five-year outputWithheldInsufficient validated cohorts
Ranking signal only · Moderate public-data coverage

The score is a percentile rank, not a 62% chance of delivery. Use it to prioritise comparable projects, then inspect the dated planning evidence and constraints before making a decision.

Positive public evidence

  • Construction has started

Risks and missing evidence

  • Long time in current stage
Source and scope. Project facts derive from the official DESNZ Renewable Energy Planning Database quarterly extract. Delivery signals and screening scores are research enrichments by this platform; public data does not reveal private finance, land, supply-chain or contract terms.