Leaps Rigg - Solar Farm
Opdenergy UK 7 Limited · Solar Photovoltaics · North West
Planning record
Project Evidence
Source fields are retained from the latest UK Renewable Energy Planning Database snapshot.
TechnologySolar Photovoltaics
Operator or applicantOpdenergy UK 7 Limited
RegionNorth West
CountyCumbria
CountryEngland
Planning authorityCumberland
Planning reference23/0415
CfD allocation roundAR7a
Planning history
Planning Timeline
- Planning submitted
- Planning granted
- Latest public record
Time to operation
Delivery Signal
Relative two-year evidence for prioritisation, separated from unvalidated literal probabilities and external-risk scenarios.
Two-year signal48/100Typical relative evidence
Three-year outputResearch onlyNot released as a probability
Five-year outputWithheldInsufficient validated cohorts
The score is a percentile rank, not a 48% chance of delivery. Use it to prioritise comparable projects, then inspect the dated planning evidence and constraints before making a decision.
Positive public evidence
- Construction has started
- CfD support recorded
Risks and missing evidence
- No major public-data warning detected