Leaps Rigg - Solar Farm

Opdenergy UK 7 Limited · Solar Photovoltaics · North West

Reported capacity49.9 MWInstalled Capacity (MWelec) in the public REPD record
Development stageAwaiting ConstructionCurrent short status in the latest source snapshot
Screening score67/100Low heuristic screening risk

Planning record

Project Evidence

Source fields are retained from the latest UK Renewable Energy Planning Database snapshot.

TechnologySolar Photovoltaics
Operator or applicantOpdenergy UK 7 Limited
RegionNorth West
CountyCumbria
CountryEngland
Planning authorityCumberland
Planning reference23/0415
CfD allocation roundAR7a

Planning history

Planning Timeline

  • Planning submitted
  • Planning granted
  • Latest public record

Time to operation

Delivery Signal

Relative two-year evidence for prioritisation, separated from unvalidated literal probabilities and external-risk scenarios.

Two-year signal48/100Typical relative evidence
Three-year outputResearch onlyNot released as a probability
Five-year outputWithheldInsufficient validated cohorts
Ranking signal only · Moderate public-data coverage

The score is a percentile rank, not a 48% chance of delivery. Use it to prioritise comparable projects, then inspect the dated planning evidence and constraints before making a decision.

Positive public evidence

  • Construction has started
  • CfD support recorded

Risks and missing evidence

  • No major public-data warning detected
Source and scope. Project facts derive from the official DESNZ Renewable Energy Planning Database quarterly extract. Delivery signals and screening scores are research enrichments by this platform; public data does not reveal private finance, land, supply-chain or contract terms.