UK renewable project intelligence · REPD 09270
New Rides Farm - Photovoltaic Panels
EnergieKontor UK Limited · Solar Photovoltaics · South East
Planning record
Project Evidence
Source fields are retained from the latest UK Renewable Energy Planning Database snapshot.
TechnologySolar Photovoltaics
Operator or applicantEnergieKontor UK Limited
RegionSouth East
CountyKent
CountryEngland
Planning authoritySwale
Planning reference21/503240/FULL
CfD allocation roundAR7a
Planning history
Planning Timeline
- Planning submitted
- Planning granted
- Latest public record
Time to operation
Delivery Signal
Relative two-year evidence for prioritisation, separated from unvalidated literal probabilities and external-risk scenarios.
Two-year signal66/100Typical relative evidence
Three-year outputResearch onlyNot released as a probability
Five-year outputWithheldInsufficient validated cohorts
The score is a percentile rank, not a 66% chance of delivery. Use it to prioritise comparable projects, then inspect the dated planning evidence and constraints before making a decision.
Positive public evidence
- Construction has started
- CfD support recorded
- Observed multi-stage progression
Risks and missing evidence
- Long time in current stage