UK renewable project intelligence · REPD 09363
Alexandra Junior School - Roof Mounted Solar System
London Borough of Hounslow · Solar Photovoltaics · London
Planning record
Project Evidence
Source fields are retained from the latest UK Renewable Energy Planning Database snapshot.
TechnologySolar Photovoltaics
Operator or applicantLondon Borough of Hounslow
RegionLondon
CountyLondon
CountryEngland
Planning authorityHounslow
Planning reference00344/A/PA2
CfD allocation roundNot reported
Planning history
Planning Timeline
- Planning submitted
- Planning granted
- Latest public record
Time to operation
Delivery Signal
Relative two-year evidence for prioritisation, separated from unvalidated literal probabilities and external-risk scenarios.
Two-year signal54/100Typical relative evidence
Three-year outputResearch onlyNot released as a probability
Five-year outputWithheldInsufficient validated cohorts
The score is a percentile rank, not a 54% chance of delivery. Use it to prioritise comparable projects, then inspect the dated planning evidence and constraints before making a decision.
Positive public evidence
- Construction has started
- Above-average developer track record
Risks and missing evidence
- Long time in current stage